Interorient Navigation (Limassol)

Client: Interorient Navigation Co. Ltd
Project start/completion:  
Architect: George Stamatiou
Mechanical Consultant: Hiteco Engineering Ltd
Main Contractor:Atlas Pantou Co. Ltd
Mechanical Contractor:Hydrothermiki Ltd

Brief Description of the building:

This office and recreations building which is being built near the new harbour of Limassol is intended to become a landmark for the area not only because of its modern appearance but also due to the fact that it incorporates numerous of energy saving techniques.

The two-block building, which is built on six-levels (Basement + Ground floor + four floors) covers an area of about 7500m2 and is intended to be the work place of around 400 people.

Mechanical Services

Cooling / Heating Plant:

Cooling is provided into the building through a combination of VRV units and Chiller – Air-Handling-Units system. The Heating load is satisfied through a combination of solar panels & Heat Pumps system.

Water Services

Cold water storage:

Cold Water is stored in two 24m3 each Glass Reinforced Plastic type (GRP) sectional tanks which are situated on the roof of the building. Water is distributed into the building through a Booster set which is situated in the basement, where the main plant-room is located.

Hot Water

Hot water is produced primarily using solar energy through an 80m2 vacuum type solar collectors. In case that the solar energy can not provide the required heating load then three Heat pumps are employed so that to assist in the production of the required heating load.