Client: | Marlow Navigation Ltd |
Project start/completion: | |
Architect: | George Stamatiou |
Mechanical Consultant: | Hiteco Engineering Ltd |
Main Contractor: | |
Mechanical Contractor: | Hydrothermiki Ltd |
Brief Description of the building:
The three-storey office building (it also includes a basement level) is situated in between the old and the new harbour in Limassol covers a space of around 5,500m2. The building houses around 300 people.
Mechanical Services
Cooling / Heating Plant:
Cooling is provided into the building through a combination of VRV units and Chiller – Air-Handling-Units system. The Heating load is satisfied through an oil fired boiler.
Water Services
Cold water storage: Water is distributed into the building through a Booster set which is situated in the basement, where the main plant-room is.